Are You Pricing Projects to Profit, or Just to Stay Busy?
Know Your Industry — General Contractor — For Owners

Are You Pricing Projects to Profit, or Just to Stay Busy?

A 20% markup is not a 20% margin. That one mix-up quietly costs contractors thousands on every job.

TARGET TOPIC: general contractor markup vs margin pricing

General contractors handle large amounts of money that mostly belong to someone else — subs, suppliers, and lenders. What's left at the end is the real business, and it's often much smaller than the contract value suggests.

Where an $85,000 project actually goes

  • Subcontractors45%roughly 45% — about $38,250 for electrical, plumbing, HVAC, drywall, and other trades
  • Materials27%roughly 27% — about $22,950
  • Overhead18%roughly 18% — about $15,300 for project management, insurance, office, vehicles, permits, and estimating time
  • Net profit10%roughly 10% — about $8,500

The markup vs. margin trap

Add 20% to your costs and you have a 20% markup — but only a 16.7% margin, because margin is measured against the selling price. If you need 28% to cover overhead and profit, a 28% markup won't get you there; you need about a 39% markup. Contractors who confuse the two price every job a few points short.

Price change orders before the work starts. Unpriced or verbally agreed changes are one of the biggest margin leaks in contracting. Write them up, price them with full markup, and get a signature before the crew moves.

Contingency is not padding

Older homes hide surprises. A clearly stated contingency or allowance protects both you and the homeowner — and keeps an unexpected beam or wiring problem from turning a profitable job into a loss.

Motion Infographic — Where an $85,000 Project’s Price Actually Goes
Subs 45%
Materials 27%
Overhead 18%
Profit 10%
Subcontractors — $38,250
Materials — $22,950
Overhead — $15,300
Net Profit — $8,500
Segments build left to right on scroll. Illustrative split — two or three unpriced change orders can erase most of that profit line without anyone noticing until the job closes.

Want this run for your general contracting business?

We run the campaign, build the infrastructure, and guarantee the leads it produces.

Book a Call →
?

Frequently Asked Questions

05 ANSWERS

Markup is added to cost; margin is measured against the selling price. A 25% markup gives a 20% margin.

Many residential contractors aim for roughly 8–12% net after all overhead, though it varies with project type and size.

In writing, before the work starts, with the same markup as the main contract. Get the client’s signature every time.

Many contractors charge for detailed design and pre-construction work, credited toward the contract. It protects your time and filters serious clients.

Use allowances or escalation clauses for volatile items and limit how long a quote stays valid.